Turnkey process

From site survey to first game, one team owns it all

An arena project brings together architecture, electronics, décor, software and people. We manage all of it on one timeline, with one point of responsibility.

  1. 01

    Site survey

    Timeline: 1–3 days

    What we do
    We visit and measure your space: dimensions, ceiling height, columns, power, ventilation and emergency exits.
    What we need from you
    Floor plan (if available), site access, target opening date.
    Deliverable
    Survey report and initial layout proposal.
  2. 02

    Concept & theme

    Timeline: 1 week

    What we do
    Together we pick a theme that fits your guests and your venue's identity — or build a fully branded one.
    What we need from you
    Your guest profile, brand guidelines and budget range.
    Deliverable
    Approved theme and concept board.
  3. 03

    Design & 3D

    Timeline: 1–2 weeks

    What we do
    Maze layout, lighting and sound plan, guest flow. You walk through the arena in 3D before anything is built.
    What we need from you
    Design feedback and sign-off.
    Deliverable
    Construction drawings, 3D visuals and final quote.
  4. 04

    Production & supply

    Timeline: 4–6 weeks

    What we do
    Walls, themed décor, equipment and electronics are produced, tested and prepared for shipping.
    What we need from you
    Power line and floor preparation on site (a detailed checklist comes with the project).
    Deliverable
    Tested equipment and décor, shipping plan.
  5. 05

    Installation

    Timeline: 1–2 weeks

    What we do
    Our crew handles assembly, cabling, lighting and sound, and tests every piece of equipment on site.
    What we need from you
    Site access during installation.
    Deliverable
    A working arena and test report.
  6. 06

    Staff training

    Timeline: 2–3 days

    What we do
    Your hosts learn game management, safety rules, equipment care and guest experience — hands-on.
    What we need from you
    Staff available for training.
    Deliverable
    A trained team and operations manual.
  7. 07

    Opening & service

    Timeline: Opening day onwards

    What we do
    We're there for the first games. After that, warranty, spare parts and remote support keep things running.
    What we need from you
    Your opening date and launch plan.
    Deliverable
    Opening-day support; warranty and service begin.

What's included

  • Venue-specific arena design and 3D visualisation
  • Maze walls and themed décor
  • Blasters, sensor vests or headbands
  • Interactive targets and base stations
  • Charging rack
  • Game management software and leaderboard
  • Theme lighting, effect lighting and sound system
  • Assembly, cabling and on-site testing
  • Staff training and operations manual
  • Warranty, spare parts and remote support

Scope may vary per project; the exact list is part of the quote.

What the venue needs to provide

  • A clear space of at least 80 m² with a ceiling height of at least 2.6 m
  • Adequate electrical supply (230 V, 3–5 kW)
  • Ventilation and climate control
  • Permits and fire safety approvals

From our installations

Photo slot

Reserved for installation and handover photos.

Photo slot

1600×1000

Photo slot

1600×1000

Let's plan your arena

A few details are enough. Our project team will review your request and get back to you.

Get a quote